Plantings+/-26 net acres are planted to Lisbon Lemons on Carrizo rootstock. Trees were planted in 2019.WaterProperty is located in Alta Irrigation District and part of Kings River East GSA. The property receives 100% allocation from Alta ID.There is one (1) 280′ ft. Ag well (12″ casing), with a 20 HP 5-stage submersible pump, installed in 2019. There is also a 15 HP booster pump.Trees are irrigated via a fan jet and drip line system.SoilThe property has Centerville clay, Exeter loam, and Hanford sandy loam soils.Wind MachinesThere are three (3) V10 propane powered Amarillo Wind Machines, with auto-start Altrac in the grove.LegalTulare County APN: 021-020-030Groundwater DisclosureSustainable Groundwater Management Act (SGMA) requires groundwater basins to be sustainable by 2040. SGMA requires a Groundwater Sustainability Plan (GSP) by 2020. Said plans may limit ground water pumping. For more information please visit the SGMA website at https://water.ca.gov/programs/groundwater-management/sgma-groundwater-management.